Feedback
How do you rate this information /service?
Addendum 2 to TBH SPA Interim Mitigation Strategy for Elmbridge
Click on document icon to open or save a copy of this document.
|![]() | Document Type: PORTABLE DOCUMENT FORMAT (|Addendum2SANGtariff.pdf) File Size: 101.00 Kb (15 seconds @ 56K) |
Further details:
< |Back to Document Library Last Updated: 5 October 2010| Abstract: | This document replaces the tariff outlined in the current Thames Basin Heaths Special Protection Area Interim Mitigation Strategy for Elmbridge. Changes have been made to align the occupancy rates with those used in relation to Strategic Access Management and Monitoring contributions (Addendum 1) and the Planning Obligations and Infrastructure SPD. |















