|Skip to content
|Home page
|What's new
|Site map
|Search
|FAQ
|Help
|Complaints
|Enquiries
|Feedback form
|List of access keys

Addendum 2 to TBH SPA Interim Mitigation Strategy for Elmbridge

Click on document icon to open or save a copy of this document.

|Open Addendum2SANGtariff.pdf in a new windowDocument Type: PORTABLE DOCUMENT FORMAT (|Addendum2SANGtariff.pdf)
File Size: 101.00 Kb (15 seconds @ 56K)


Further details:

Abstract:This document replaces the tariff outlined in the current Thames Basin Heaths Special Protection Area Interim Mitigation Strategy for Elmbridge. Changes have been made to align the occupancy rates with those used in relation to Strategic Access Management and Monitoring contributions (Addendum 1) and the Planning Obligations and Infrastructure SPD.
|Back to Document Library Last Updated: 5 October 2010


Search A-Z of services